Projects

Caliper Survey (XYZ mapping), Drying, Nitrogen Purging & Packing

Owner: Bapco Energies

Project Scope

Engineering, Project management, Caliper Survey (XYZ mapping), Drying, Pneumatic Leak Test, Nitrogen Purging & Packing of 24" X 6 KM Kerosene transfer & subsea Pipeline 24" X 6 KM MTBE / Naptha transfer & subsea Pipeline

Highlights

Duration:1 Month
Man-hours: 1,368⁺ Hours, without LTI

Cleaning of Heat Exchangers

Owner: Bapco Energies

Project Scope

Engineering, Project Management, Hot Water Flushing, Iron Oxide & Silicate Removal of 6 Nos heat exchangers

Highlights

Duration: 6 Days
Man-hours: 330⁺ Hours, without LTI

Chemical cleaning & Degreasing of Amine Systems

Owner: Bapco Energies

Project Scope

Engineering, Project Management, Degreasing of Residue Hydrocracker, Hydrodesulfurization Unit, Hydrogen Recovery Unit, Hydrocracker Unit, Saturated Gas Plant, Crude / Vacuum Tank etc. – 13 Units

Highlights

Duration: 5 Months
Man-hours: 1,400⁺ Hours, without LTIMan-hours: 330⁺ Hours, without LTI

Hydromilling Services

Owner: Bapco Energies

Project Scope

Engineering, Project Management, Hydromilling of Hydrogen, sour gas, feed gas, propane, CDU overhead vapour, recycle gas Compressor suction lines

Cleaning, Drying, Nitrogen purging & packing

Owner: Bapco Energies

Project Scope

Engineering, Project Management, Cleaning of pipelines by specially designed pig train, Drying, Nitrogen Purging & Packing of 24″ X 4.1 KM Diesel transfer onshore Pipeline, 24″ X 4.1 KM Kerosene transfer onshore Pipeline, 24″ X 4.1 KM MTBE / Naptha transfer onshore Pipeline

Highlights

Duration: 20 Days
Man-hours: 2,200⁺ Hours, without LTI

Pre-commissioning Services for Subsea Pipelines

Owner: Bapco Energies

Project Scope

Flooding, Cleaning, Gauging, Hydrotest, Dewatering, Caliper Survey, Final Cleaning by pig assisted water flushing, Drying, Nitrogen purging of 24″ X 1.8 KM Diesel transfer subsea pipeline, 24″ X 1.8 KM Kerosene transfer subsea pipeline, 24″ X 1.8 KM MTBE / Naptha transfer subsea line, 14″ X 1.1 KM Gasolene subsea pipeline, 3″ X 1.1 KM Nitrogen subsea pipeline, 3″ X 1.1 KM Instrument air subsea pipeline

Highlights

Duration: 6 Months
Man-hours: 6,000 Hours, without LTI

Pre-commissioning Services for Sealines

Owner: Bapco Energies

Project Scope

Cleaning, Gauging, Flooding, Hydrotest, Dewatering, Drying of multiple pipe strings of sizes 24”, 14” & 3”.
Pig assisted pre-flooding during installation of pipe strings @Subsea, preventing seawater ingress.
Leak tightness test of subsea flange joints 

Highlights

Duration: 7 Months
Man-hours: 2,400 Hours, without LTI

Under Construction

Featured Projects

Explore What We've Done

Hardly able to cover it and seemed ready to slide off any moment. His many legs, pitifully thin compared with the size of the rest of him

Let’s Get in Touch!

Raising a heavy fur muff that covered the whole of her lower arm towards the viewer. Gregor then turned to look out the window at the dull weather.

Call us

+973 17673171

Email us

info@sygmawll.com