Cleaning
The first operation during pre-commissioning is to clean and fill the pipeline.
Gauging
The Purpose of this operation is to prove the continuous diameter of the pipeline.
Caliper Survey
Caliper-Tool is an intelligent inspection system which serves to measure diameter reductions.